Membrane-Covered Biogas Digester

Anaerobic Env.HDPE geomembrane (bottom/top membrane)

覆膜沼气池与配套处理设施

Case Record

Project typeAnaerobic Env.
Application scenarioBottom and top membrane containment for a covered black-membrane digester in an anaerobic wastewater scenario. Details are subject to authorized public content.
Materials usedHDPE geomembrane (bottom/top membrane)

Project Background

This page is a record of the project type matching the available site photo. Such works generally solve a containment or protection problem under the relevant working conditions; the specific project name, location, scale, owner and construction date are published only when authorized. Unauthorized details are not shown, and generic copy is not presented as a specific project record.

Material Selection Basis

Materials are selected according to the engineering medium, base and slope conditions, load, durability requirements and design codes; the materials used in this case are listed above. The specific selection basis, thickness and composite structure should follow the design documents and inspection reports.

Construction Method (General Points)

  • Base acceptance: level and compact, remove sharp objects and standing water, confirm the base meets laying conditions.
  • Laying: roll in the laying direction and reserve slack; avoid over-tensioning and local loading.
  • Lap and connection: weld, stitch or fix laps per material type; lap width and connection method follow current codes and design requirements.
  • Joint inspection: inspect welds, edges and anchoring joints; repair defects in time.
  • Finished protection: lay the protective layer and protect the work from later processes.

Actual process parameters, lap width and inspection records of this project follow the construction documents; they are not disclosed without authorization.

Site Record & Actual Outcome

This page shows a photo record from the laying / covering stage. Acceptance conclusions, operating performance and related data are added only when authorized; no performance evaluation or result commitment is made before authorization.

Record note: this archive shows how the material is applied in the corresponding project type, and is not a complete as-built record of a specific project. To verify the supply and construction scope of a particular work, please contact the company for confirmation.