Dezhou Yurun Geotechnical Material Co., Ltd.|Geosynthetic materials manufacturer, Dezhou, Shandong, China Hotline 0534-8661234 (Mr. Zhao) Geomembrane · Geotextile · Composite Geomembrane · Bentonite GCL · Drainage Net · Eco Bag EN 中文
Procurement Hotline0534-8661234 Get a Quote

Composite Geomembrane

Two-cloth-one-membrane / one-cloth-one-membrane

Composite Geomembrane product photo

A composite of geomembrane and geotextile that combines containment with protection and filtration, available in one-cloth-one-membrane, two-cloth-one-membrane and filament/staple composites, widely used in reservoir, canal, lake and subgrade lining.

Performance Features

  • Containment + protection in one: membrane and fabric combined provide impermeability and cloth protection.
  • Structures available: one-cloth-one-membrane / two-cloth-one-membrane, selected by base and protection requirements.
  • Easier laying: composite rolls ease laying and lapping and reduce on-site layered work.
  • Indicators follow the test report; thickness, weight, strength and permeability are confirmed per batch file.

Specifications & Technical Parameters

Material / StructurePer product series; see series description and delivered-batch test report.
Thickness / WeightSelected by engineering design; exact value per design documents and test report.
WidthPer available production specs and order confirmation.
FunctionContainment / filtration / separation / reinforcement / protection / drainage as applicable.
Standard basisGB/T 17642 etc..

Applicable Standard

Reference standard

GB/T 17642 etc..

Standard version and specific indicators follow the inspection report and the technical requirements agreed by both parties.

Sub-specifications

Typical Scenarios

  • Reservoir / canal lining
  • Artificial lake
  • Subgrade containment
  • Aquaculture pond

Construction Notes

Store away from sun exposure and sharp objects; accept and level the base before laying; lap width, connection and weld inspection follow current codes; protect the finished product afterward. Design and construction responsibility follows project drawings, codes and qualified contractors.

Related Cases

☎ ✆ ↑