Dezhou Yurun Geotechnical Material Co., Ltd.|Geosynthetic materials manufacturer, Dezhou, Shandong, China Hotline 0534-8661234 (Mr. Zhao) Geomembrane · Geotextile · Composite Geomembrane · Bentonite GCL · Drainage Net · Eco Bag EN 中文
Procurement Hotline0534-8661234 Get a Quote

Eco Bag

Vegetation / filament / staple eco bag

Eco Bag product photo

A slope protection and ecological restoration bag sewn from permeable vegetation fabric, filled with planting soil and stacked to retain soil and restore vegetation, used in riverbank protection, slope greening and mine restoration.

Performance Features

  • Vegetated slope protection: filled bags are stacked to combine soil retention with vegetation recovery.
  • Permeable and breathable: the bag allows water and roots through to support slope greening.
  • Connected body: connecting clips interlock to form an integrated slope facing.
  • Indicators follow technical data; bag strength, UV resistance and fill ratio are confirmed per batch file.

Specifications & Technical Parameters

Material / StructurePer product series; see series description and delivered-batch test report.
Thickness / WeightSelected by engineering design; exact value per design documents and test report.
WidthPer available production specs and order confirmation.
FunctionContainment / filtration / separation / reinforcement / protection / drainage as applicable.
Standard basisRefer to GB/T 17639 and related geotextile standards.

Applicable Standard

Reference standard

Refer to GB/T 17639 and related geotextile standards.

Standard version and specific indicators follow the inspection report and the technical requirements agreed by both parties.

Sub-specifications

Typical Scenarios

  • Riverbank protection
  • Slope greening
  • Mountain / mine restoration
  • Landscape retaining

Construction Notes

Store away from sun exposure and sharp objects; accept and level the base before laying; lap width, connection and weld inspection follow current codes; protect the finished product afterward. Design and construction responsibility follows project drawings, codes and qualified contractors.

Related Cases

☎ ✆ ↑