Tailings / Mine Yard Containment
Tailings water contains heavy metals, acids/alkalis and flotation reagents with strong corrosivity, placing higher demands on material chemical resistance and slope anti-slip than ordinary works, to block percolation into surrounding soil and water.

Applicable Conditions & Selection Logic
Textured or smooth HDPE geomembrane, composite geomembrane and drainage net are selected by pond type and medium; textured membrane is considered on steep slopes, with filtration and drainage facilities paired.
Material Configuration
Membrane, fabric, blanket or net combination is chosen by work type, medium corrosivity, base conditions, slope and design requirements; exact thickness, weight and composite structure are fixed by design documents.
Construction Flow
Dam and base treatment -> containment laying and welding -> drainage facilities -> inspection acceptance and monitoring cooperation.
Quality Control & Risk Notes
Tailings ponds are high-risk works; material corrosion resistance, dam stability and drainage design must be determined by a qualified designer based on survey and medium analysis, with leakage monitoring during operation.
This page is an engineering selection and process reference; structure, material specs and acceptance standards follow project drawings, design documents and current codes.