Dezhou Yurun Geotechnical Material Co., Ltd.|Geosynthetic materials manufacturer, Dezhou, Shandong, China Hotline 0534-8661234 (Mr. Zhao) Geomembrane · Geotextile · Composite Geomembrane · Bentonite GCL · Drainage Net · Eco Bag EN 中文
Procurement Hotline0534-8661234 Get a Quote

Tailings Yard Slope Containment Record

Mine YardHDPE geomembrane, composite drainage net, geotextile protection

粉煤灰堆场边坡膜体铺设与碾压施工全景

Case Record

Project typeMine Yard
Application scenarioSite record of containment membrane, protection layer and conduction facilities laid on the slope and base of a mine backfill yard. Medium composition and structure are per design documents.
Materials usedHDPE geomembrane, composite drainage net, geotextile protection

Project Background

This page is a record of the project type matching the available site photo. Such works generally solve a containment or protection problem under the relevant working conditions; the specific project name, location, scale, owner and construction date are published only when authorized. Unauthorized details are not shown, and generic copy is not presented as a specific project record.

Material Selection Basis

Materials are selected according to the engineering medium, base and slope conditions, load, durability requirements and design codes; the materials used in this case are listed above. The specific selection basis, thickness and composite structure should follow the design documents and inspection reports.

Construction Method (General Points)

  • Base acceptance: level and compact, remove sharp objects and standing water, confirm the base meets laying conditions.
  • Laying: roll in the laying direction and reserve slack; avoid over-tensioning and local loading.
  • Lap and connection: weld, stitch or fix laps per material type; lap width and connection method follow current codes and design requirements.
  • Joint inspection: inspect welds, edges and anchoring joints; repair defects in time.
  • Finished protection: lay the protective layer and protect the work from later processes.

Actual process parameters, lap width and inspection records of this project follow the construction documents; they are not disclosed without authorization.

Site Record & Actual Outcome

This page shows a photo record from the laying / covering stage. Acceptance conclusions, operating performance and related data are added only when authorized; no performance evaluation or result commitment is made before authorization.

Record note: this archive shows how the material is applied in the corresponding project type, and is not a complete as-built record of a specific project. To verify the supply and construction scope of a particular work, please contact the company for confirmation.

Related Products