Dezhou Yurun Geotechnical Material Co., Ltd.|Geosynthetic materials manufacturer, Dezhou, Shandong, China Hotline 0534-8661234 (Mr. Zhao) Geomembrane · Geotextile · Composite Geomembrane · Bentonite GCL · Drainage Net · Eco Bag EN 中文
Procurement Hotline0534-8661234 Get a Quote

Taiyuan Tunnel Geotextile Bid Candidate

Tunnel Works400g/㎡ impermeable geotextile, 400g/㎡ filament woven geotextile, 350g/㎡ short-fiber needle-punched geotextile

山区隧道洞口施工现场记录

Case Record

Project typeTunnel Works
Application scenarioBid candidate public notice for geotechnical materials procured by a Shanxi road & bridge tunnel branch; our company is the first-ranked bid candidate, quoted RMB 5,573,481.58. Candidate status is not a final award; the outcome is subject to the formal award notice and contract.
Materials used400g/㎡ impermeable geotextile, 400g/㎡ filament woven geotextile, 350g/㎡ short-fiber needle-punched geotextile

Project Background

This project is summarized from a public procurement notice. Bid-candidate status is not a final award; the final outcome is subject to the formal award notice and contract, and the quoted/awarded amount follows the public notice, with final settlement per the formal contract.

Material Selection Basis

Materials are selected according to the engineering medium, base and slope conditions, load, durability requirements and design codes; the materials used in this case are listed above. The specific selection basis, thickness and composite structure should follow the design documents and inspection reports.

Construction Method (General Points)

  • Base acceptance: level and compact, remove sharp objects and standing water, confirm the base meets laying conditions.
  • Laying: roll in the laying direction and reserve slack; avoid over-tensioning and local loading.
  • Lap and connection: weld, stitch or fix laps per material type; lap width and connection method follow current codes and design requirements.
  • Joint inspection: inspect welds, edges and anchoring joints; repair defects in time.
  • Finished protection: lay the protective layer and protect the work from later processes.

Actual process parameters, lap width and inspection records of this project follow the construction documents; they are not disclosed without authorization.

Site Record & Actual Outcome

This page shows a photo record from the laying / covering stage. Acceptance conclusions, operating performance and related data are added only when authorized; no performance evaluation or result commitment is made before authorization.

Record note: this archive shows how the material is applied in the corresponding project type, and is not a complete as-built record of a specific project. To verify the supply and construction scope of a particular work, please contact the company for confirmation.

Related Products

Related Technical Articles

☎ ✆ ↑