Chifeng Mine Tailings Membrane Candidate
Mine YardShort-fiber HDPE composite geomembrane

Case Record
| Project type | Mine Yard |
|---|---|
| Application scenario | Bid candidate public notice for short-fiber HDPE composite geomembrane for a lead-zinc-silver mine tailings pond in Linxi, Chifeng, Inner Mongolia; our company is the first-ranked bid candidate, quoted RMB 4,380,000, total quantity about 200,000㎡ in three batches. Candidate status is not a final award; outcome subject to formal documents. |
| Materials used | Short-fiber HDPE composite geomembrane |
Project Background
This project is summarized from a public procurement notice. Bid-candidate status is not a final award; the final outcome is subject to the formal award notice and contract, and the quoted/awarded amount follows the public notice, with final settlement per the formal contract.
Material Selection Basis
Materials are selected according to the engineering medium, base and slope conditions, load, durability requirements and design codes; the materials used in this case are listed above. The specific selection basis, thickness and composite structure should follow the design documents and inspection reports.
Construction Method (General Points)
- Base acceptance: level and compact, remove sharp objects and standing water, confirm the base meets laying conditions.
- Laying: roll in the laying direction and reserve slack; avoid over-tensioning and local loading.
- Lap and connection: weld, stitch or fix laps per material type; lap width and connection method follow current codes and design requirements.
- Joint inspection: inspect welds, edges and anchoring joints; repair defects in time.
- Finished protection: lay the protective layer and protect the work from later processes.
Site Record & Actual Outcome
This page shows a photo record from the laying / covering stage. Acceptance conclusions, operating performance and related data are added only when authorized; no performance evaluation or result commitment is made before authorization.
Related Products
Geomembrane
HDPE / LDPE / LLDPE impermeable membrane
Geotextile
Filament / staple / woven geotextile
Composite Geomembrane
Two-cloth-one-membrane / one-cloth-one-membrane
Related Technical Articles
How to choose geomembrane thickness: key conditions
Thickness should not be chosen by experience alone; it is determined jointly by engineering medium, base conditions, puncture resistance, slope and design specifications.
Geotextile vs geomembrane: differences and uses
Geotextile is permeable for filtration, separation, reinforcement and protection; geomembrane is impermeable for containment; they are often used in composite or paired arrangements.
How to weld geomembrane: laps and weld inspection
Connection is mainly hot-melt welding; lap width, weld type and air/vacuum testing follow specifications, with caution in rain, low temperature and damp base conditions.